Skip to content

Commercial Project Gallery

StevensConstruction_MarlinsPlaza_Gallery

Marlin’s Brewhouse

This project consisted of the installation of eighteen (18) televisions, audio distribution throughout facility, Wi-Fi access points, as well as security camera installation and monitoring.

More
overview-1-e1625830820747

PopStroke Fort Myers

The project at PopStroke Fort Myers consisted ofthe installation of outdoor Wi-Fi access points, surveillance cameras, landscape audio and fiber optics

More
exterior-2

Executive Medical Center

For this project, our installation included card access control, structured cabling, security camera surveillance, audio distribution, a nurse call system and fiber optics.

More
cover

City of Sebastian

Completion of this project for the City of Sebastian included over 500 Cat6 Data Drops, 3,000 feet of Fiber Optic Cable, 288 Fiber Optic Splices, Fuel Pump Network, Access Control Systems, IP Surveillance Systems, multiple conference rooms with Smart Boards, and pro audio/video and automation control.

More