Marlin’s Brewhouse
This project consisted of the installation of eighteen (18) televisions, audio distribution throughout facility, Wi-Fi access points, as well as security camera installation and monitoring.
This project consisted of the installation of eighteen (18) televisions, audio distribution throughout facility, Wi-Fi access points, as well as security camera installation and monitoring.
The project at PopStroke Fort Myers consisted ofthe installation of outdoor Wi-Fi access points, surveillance cameras, landscape audio and fiber optics
For this project, our installation included card access control, structured cabling, security camera surveillance, audio distribution, a nurse call system and fiber optics.
Completion of this project for the City of Sebastian included over 500 Cat6 Data Drops, 3,000 feet of Fiber Optic Cable, 288 Fiber Optic Splices, Fuel Pump Network, Access Control Systems, IP Surveillance Systems, multiple conference rooms with Smart Boards, and pro audio/video and automation control.
Completion of this project for the City of Sebastian included over 500 Cat6 Data Drops, 3,000 feet of Fiber Optic Cable, 288 Fiber Optic Splices, Fuel Pump Network, Access Control Systems, IP Surveillance Systems, multiple conference rooms with Smart Boards, and pro audio/video and automation control.